DEMO 02 OF 08 · DMAIC PROJECT MANAGER
Watch PlantPilot AI manage Apex Automotive's 3 active DMAIC projects — AI-generated summaries, phase task tracking, and one-click document generation.
PP
PLANTPILOT AI
CONTINUOUS IMPROVEMENT PLATFORM
Facility:Apex Automotive Stamping LLCIATF 16949
Claude AI Live
CI Tools
DMAIC Projects 3
5S Audit
ROI Calculator
Kaizen Events
Action Plans 14
CI Agent
KPI Dashboard

DMAIC Project Manager

3 active projects · AI monitoring · Auto-populated from facility data

🎯

Line 2 Die Scrap Reduction

Production · Die clearance deviation at station 4 · $38,400/mo material loss

ANALYZET. Johnson · S. Reyes
⚙️

Ford PPM Reduction — Door Brackets

Quality · Ford Wayne Assembly defects · PPM 142 vs target 50

DEFINES. Reyes · D. Clarke
⏱️

Line 1 Changeover Reduction (SMED)

Production · Changeover at 47 min avg · Target 28 min

CONTROLT. Johnson · L. Park

Line 2 Die Scrap Reduction

DMAIC Project · Production · Owner: Terrell Johnson + Sandra Reyes

Die ScrapStation 4Line 2Ford Program$38,400/mo
DEFINE100%
MEASURE100%
ANALYZE65%
IMPROVE0%
CONTROL0%
PLANTPILOT AI · ANALYZE PHASE SUMMARY
Root cause confirmed: die clearance deviation at station 4 producing tear-out and burring on the body-side bracket. Regression analysis (R²=0.78) shows clearance deviation as primary driver (62% scrap contribution). Contributing: worn punch tip geometry on Tool ID AP-204 (18%). Maintenance logs confirm Tool AP-204 ran 118,000 hits past scheduled PM due to SAP migration data loss. Corrective path: die insert replacement + tooling PM SOP update. Recommend transitioning to Improve phase immediately. Estimated savings post-fix: $34,200–$38,400/month.
Define Phase
Project charter written — scope: Line 2 scrap ≥1.5%
T. Johnson
SIPOC completed, process mapped
L. Park
Baseline scrap cost quantified: $38,400/mo
S. Reyes
Measure Phase
MSA completed — Gauge R&R ≤10%
D. Clarke
30-day defect data collected by station
S. Reyes
Cpk baseline: 0.83 — incapable process
S. Reyes
Analyze Phase
Fishbone + 5-Why completed for station 4
L. Park
Regression: clearance deviation R²=0.78
S. Reyes
Hypothesis test on tool AP-204 geometry
In progress — D. Clarke
Root cause report for leadership sign-off
T. Johnson
Improve Phase
Die insert replacement — Tool AP-204
R. Dolan
Updated SOP-PRD-022 Rev 2.2 issued
L. Park
Pilot run: 10,000 parts — measure scrap
T. Johnson

Document Generator

Line 2 Die Scrap Reduction · All DMAIC data auto-populated · One-click generation

📋
Project Charter
DMAIC Scope · PDF
📊
Tollgate Report
Analyze Phase · PPT
🔍
8D Report
Ford-format · DOCX
📉
Control Plan
IATF 16949 · XLSX
3 Active DMAIC ProjectsPlantPilot AI tracks each project through all 5 DMAIC phases — tasks, owners, deadlines, and AI summaries for every milestone.
AI Analyze Phase SummaryPlantPilot AI reads all collected data and writes the complete phase summary — root cause, regression findings, and recommended next steps.
Phase Task TrackingEvery DMAIC task has an owner, status, and AI-generated recommendation. No spreadsheets. No status meetings.
One-Click Document GenerationDMAIC data auto-populates every document — 8D Reports, Control Plans, Tollgate presentations — in the correct Ford, GM, or IATF format.
Ford 8D Auto-GeneratedPlantPilot AI pulls from the project charter, regression findings, containment log, and org chart to build a complete, submittable 8D report.
Scene 1 of 5